West End

Excavation, Shoring, and Dewatering works 
An offices building with five basements and eleven storeys 
Excavation to 15m depth, with 25cm and 30cm piles connected upwards with cap beams reinforced concrete and anchors.

  • Category:

    Construction

  • Client:

    National Holding Group (NHG)

  • Period:

    2010

  • Value:

    550,000 USD

  • Location:

    Gemmayzeh - Beirut

  • Consultant:

    Insight Engineering

Go Back Top